About us| Favorite| sitemap

Hello, welcome to the website of Dongguan Gaoshang Machinery Co., Ltd.!

东莞市高尚机械有限公司

东莞市高尚机械有限公司

中文英文 Tel:400-6556-156

support hotline:

400-0556-156

Dongguan Gaoshang Machinery Co., Ltd.

Mobile: 13925556156 (Mr. Yang)

Mobile: 18575381952 (Miss Xue)

Tel: 0769-86866158

Fax: 0769-85623986

E-mail: 13925556156@163.com

Address: Cha Nan Road, Chashan Town, Dongguan City, Guangdong Province

common problem
Your position: Home » English > News > common problem >

What preparations should the customer do before installing the door?

Article Source:Popularity: Posted:2018-04-04 08:57:19
1. before our installers reach four hours, we must confirm the position of the machine to be placed and confirm the flat surface and no sundries; 2. prepare the 380V electricity and the installation wire (10 square wire) for the installation of the machine; 3. the forklift for unloading, if the crane needs to be predefined in advance, and the crane is confirmed in advance. The goods window, if need to hit the window, please arrange in advance; 4. arrange 2-3 staff members to cooperate with our installer work; 5. notice the machine operator or master in advance to wait for our installers to carry on the operation and safety training of the installation personnel; study carefully during the training.

400-6556-156

罗小姐

服务热线:400-6556-156